Plumbing
Fixtures, risers, lines — read by sheet, priced by line.
OmniTakeoff parses P-sheets and isometrics into a fixture schedule, riser quantity sheet, and below-grade sanitary/storm takeoff with each pipe run anchored to the page and detail it came from.
260+
Fixture types indexed
Substantial improvement after active learning
Recognizer accuracy after active learning
All editions
ASPE / IPC / UPC
What the takeoff produces
A plumbing takeoff that survives review.
Every line item carries the source it came from — sheet, detail, and spec paragraph — so the senior estimator can audit in minutes, not hours.
- Fixture counts by type with brand/model where the schedule names one
- Domestic, sanitary, storm and vent lengths separated by diameter and material
- Below-grade vs. above-grade routing kept distinct for excavation linkage
- Insulation, hangers, and supports calculated as %-of-pipe assemblies
- Trim, escutcheons, and stops surfaced from the spec, not the floor plan
- Tankless, pumps, and water heaters flagged for manual datasheets
Plumbing features
Built for the way your office actually bids.
Fixture schedule extraction
Tabular schedules — F1 / F2 / F3 — become structured rows with model, accessory, and rough-in callouts pulled cleanly.
Pipe routing geometry
Plan-view and isometric runs are cross-referenced; lengths are calibrated against page scale, not guessed from sheet width.
Spec-paragraph linking
Every fixture, valve, and accessory row points at the exact spec paragraph that named it.
Underground takeoff
Sanitary and storm below-grade are reported with depth-of-cover bands so excavation can price the right trench.
Frequently asked
Questions we hear from estimators.
- Do you handle medical-gas systems?
- Yes — medical gas is treated as its own subsystem with NFPA 99 zones and shutoff valves tagged separately from domestic.
- Can I import my fixture cost catalog?
- Yes. The org cost database supports CSV import and SKU-level overrides; takeoff fixtures auto-match against your catalog before falling back to RSMeans.
- What about tankless or commercial pumps?
- These are flagged as complicated equipment — you'll get a 'upload the manual' prompt and the takeoff includes accessories, controls, and labor factors once the manual is linked.
Next move
Bring a real plumbing bid. We'll run it.
The pilot is end-to-end: real plan set, real takeoff, real proposal. No demo data.