Skip to main content

Plumbing

Fixtures, risers, lines — read by sheet, priced by line.

OmniTakeoff parses P-sheets and isometrics into a fixture schedule, riser quantity sheet, and below-grade sanitary/storm takeoff with each pipe run anchored to the page and detail it came from.

  • 260+

    Fixture types indexed

  • Substantial improvement after active learning

    Recognizer accuracy after active learning

  • All editions

    ASPE / IPC / UPC

What the takeoff produces

A plumbing takeoff that survives review.

Every line item carries the source it came from — sheet, detail, and spec paragraph — so the senior estimator can audit in minutes, not hours.

  • Fixture counts by type with brand/model where the schedule names one
  • Domestic, sanitary, storm and vent lengths separated by diameter and material
  • Below-grade vs. above-grade routing kept distinct for excavation linkage
  • Insulation, hangers, and supports calculated as %-of-pipe assemblies
  • Trim, escutcheons, and stops surfaced from the spec, not the floor plan
  • Tankless, pumps, and water heaters flagged for manual datasheets

Plumbing features

Built for the way your office actually bids.

  • Fixture schedule extraction

    Tabular schedules — F1 / F2 / F3 — become structured rows with model, accessory, and rough-in callouts pulled cleanly.

  • Pipe routing geometry

    Plan-view and isometric runs are cross-referenced; lengths are calibrated against page scale, not guessed from sheet width.

  • Spec-paragraph linking

    Every fixture, valve, and accessory row points at the exact spec paragraph that named it.

  • Underground takeoff

    Sanitary and storm below-grade are reported with depth-of-cover bands so excavation can price the right trench.

Frequently asked

Questions we hear from estimators.

Do you handle medical-gas systems?
Yes — medical gas is treated as its own subsystem with NFPA 99 zones and shutoff valves tagged separately from domestic.
Can I import my fixture cost catalog?
Yes. The org cost database supports CSV import and SKU-level overrides; takeoff fixtures auto-match against your catalog before falling back to RSMeans.
What about tankless or commercial pumps?
These are flagged as complicated equipment — you'll get a 'upload the manual' prompt and the takeoff includes accessories, controls, and labor factors once the manual is linked.

Next move

Bring a real plumbing bid. We'll run it.

The pilot is end-to-end: real plan set, real takeoff, real proposal. No demo data.

Plumbing Takeoff & Bid Pipeline — OmniTakeoff