Skip to main content

Migration Guides

From PlanSwift, Bluebeam, STACK, OST.

Step-by-step migration playbooks for the four most-common incumbents. What carries over, what needs rebuilding, parallel-run protocol, and how long it really takes.

Per-vendor guides

4 migration paths

  • Migrating from PlanSwift to OmniTakeoff

    low difficulty

    2–3 weeks

    Data portability

    PlanSwift exports CSV from its takeoff workspace. We provide an importer that maps PlanSwift's standard schema to OmniTakeoff line items.

    What carries over
    • Historical takeoff line items (CSV import)
    • Assembly database (with mapping spreadsheet — we provide the template)
    • Project-level metadata (project name, address, sheet metadata)
    • Symbol library mappings via our PlanSwift symbol export tool
    What needs rebuilding
    • Symbol-library training is org-specific; the recognizer ramps over the first weeks of active learning on your sheets (specific accuracy curves shared under NDA)
    • Custom report templates need rebuilding in our proposal editor (CSM time is bundled to assist)
    • Plugin-based AI auto-counts (e.g., third-party Symbio integration) do not transfer — but native AI is included

    Parallel-run protocol

    Run PlanSwift + OmniTakeoff in parallel for the first 2 bids to validate quantity outputs against your team's manual counts. By bid 3, customers typically retire PlanSwift for new bids while keeping it available for read-only access to historical projects.

    Request the PlanSwift migration kit
  • Migrating from Bluebeam Revu to OmniTakeoff

    medium difficulty

    3–4 weeks

    Data portability

    Bluebeam stores measurement data in PDF annotations + Studio session metadata. We extract takeoff data via our Bluebeam markup importer (PDF-by-PDF).

    What carries over
    • PDF measurement annotations imported as takeoff lines
    • Studio session participants (mapped to OmniTakeoff users)
    • Markup tool customizations rebuilt as OmniTakeoff symbol-library entries
    • Project drawings imported directly
    What needs rebuilding
    • Bluebeam users tend to have heavy custom toolchests — we provide a worksheet to map each tool to a symbol-library entry
    • Legends + custom title-block stamps require manual rebuild (typical: 2–4 hours per stamp set)
    • Bluebeam Studio collaboration model differs from our review-queue model; teams typically prefer the queue after 1 week

    Parallel-run protocol

    Bluebeam migration is the most workflow-impactful because users have years of muscle memory in the Markup panel. We recommend running Bluebeam read-only for the first 30 days while OmniTakeoff handles new takeoffs. Most customers fully migrate within 6 weeks.

    Request the Bluebeam migration kit
  • Migrating from STACK to OmniTakeoff

    low difficulty

    2 weeks

    Data portability

    STACK exports a structured project archive (XML + binary asset bundle). We import the full archive including assembly definitions.

    What carries over
    • STACK projects (full takeoff history + assemblies)
    • Assembly database mapped to our pricing system
    • Drawings + sheets
    • User accounts and project permissions
    What needs rebuilding
    • STACK's auto-count rules don't transfer; recognizer training is org-specific
    • Custom report templates rebuild in our proposal editor
    • Workflow status definitions differ — we provide a mapping table during onboarding

    Parallel-run protocol

    STACK migrations are typically clean because both platforms are cloud-native with similar data models. Most customers parallel-run for 1 week, then cut over fully.

    Request the STACK migration kit
  • Migrating from On-Screen Takeoff (OST) to OmniTakeoff

    medium difficulty

    3 weeks

    Data portability

    OST stores projects in a proprietary format. We extract via OST's Excel export endpoint and a tab-delimited audit-trail dump.

    What carries over
    • Project history via Excel export
    • Sheet metadata + drawing files
    • Audit-trail records (read-only archive)
    • Quantity counts mapped to our line-item schema
    What needs rebuilding
    • OST Style libraries (the OST equivalent of symbol libraries) require manual mapping
    • OST Pages → OmniTakeoff sheets is a 1:1 mapping but assembly logic differs
    • OST report templates do not transfer; rebuild in our proposal editor

    Parallel-run protocol

    OST customers tend to have very long historical archives. We import the historical archive read-only and run OmniTakeoff on net-new projects starting day 1. After 30 days, customers typically retire OST entirely.

    Request the OST migration kit

What every migration includes

Bundled with onboarding, no extra fee

Migration specialist

A named migration specialist for the duration of the cutover. Slack channel + weekly check-in until you sign off on parallel-run results.

Data import + validation

We'll do the data import. You'll review a parallel-run report comparing OmniTakeoff output to your incumbent's output, line-by-line, on 2 historical bids you choose.

Team training

Live sessions for your estimators (90 min × 2). Recorded for replay. Custom training available on Enterprise.

Migrating from something else?

Custom migrations on request.

If your team is on Excel, ProEst, eTakeoff, Sage Estimating, or a homegrown system — we've migrated from all of them. Email us with your current tooling and we'll send a custom plan.

Migration Guides — OmniTakeoff