Skip to main content

Healthcare

OSHPD, FGI, ICRA — built in.

Healthcare bids fail on the details: medical gas zones, lead-lined assemblies, ICRA / ILSM phasing. OmniTakeoff treats them as first-class scope, not a comments column.

  • Yes

    FGI / OSHPD aware

  • I-IV

    ICRA classes tracked

  • NFPA 99 zones

    Med-gas systems

What you'll bid

Project shapes we see in healthcare construction.

  • Hospital fit-outs and tower expansions
  • Outpatient surgical centers
  • Imaging suites (CT, MRI, X-ray) with shielding
  • Cath labs and ORs
  • Skilled nursing and assisted-living facilities

Why OmniTakeoff

Where the platform shows its work for healthcare construction.

  • Med-gas zones tracked as their own scope group with NFPA 99 awareness
  • Lead-lined GWB and viewing windows are first-class line items
  • ICRA / ILSM phasing surfaces as project-level scope, with associated barriers + filtration tracked
  • Imaging shielding takeoff (Pb thickness × wall area) per spec
  • Owner-vendor coordination scope (FF&E, low-voltage) split out for clarity
  • Strict change-control workflow with full audit log on every line edit

Healthcare Construction features

The mechanics behind the headline.

  • Med-gas zoning

    Zones, valves, alarm panels, and area-of-use bracketing per NFPA 99 — separate from domestic plumbing.

  • Shielding takeoff

    Lead-lined GWB SF, leaded glass viewing windows, and Pb-equivalent door / frame assemblies tracked by spec section.

  • ICRA phasing

    Class I / II / III / IV phases drive the barrier, filtration, and worker-PPE scope additions automatically.

  • Audit-grade evidence graph

    Every line item ties to the source sheet + spec paragraph. Healthcare reviewers expect this; we make it default.

Frequently asked

Questions we hear from healthcare construction estimators.

Do you handle BSL-2 / BSL-3 lab fit-outs?
Yes — biosafety levels surface as their own scope category with envelope and HVAC scope priced according to the level's requirements.
What about Joint Commission readiness?
Compliance scope (life-safety drawings, ILSM signage, fire-watch logs) is part of the validation step, not an afterthought.

Next move

Bring a real healthcare construction bid. We'll run it.

Healthcare Construction — OmniTakeoff