Skip to main content

General Contractors

Plans in. GC bid packet out.

OmniTakeoff turns a 1,000-sheet plan set into a multi-trade rollup with sub coverage, RFI tracking, addendum delta, and a branded proposal — without you typing the takeoff yourself.

  • 9

    Avg trades on a bid

  • Built in

    Sub-coverage tracking

  • Auto

    Addendum delta

What the takeoff produces

A general contractor takeoff that survives review.

Every line item carries the source it came from — sheet, detail, and spec paragraph — so the senior estimator can audit in minutes, not hours.

  • Multi-trade rollup with division-level subtotals
  • Sub-coverage tracker with RFQ outbox and bid-day chase list
  • Addendum delta showing scope and cost impact line by line
  • RFI log with automated answer-link from the spec or drawing
  • General conditions pulled from a project-aware template
  • Branded proposal package with markup waterfall and exclusions

General Contractor features

Built for the way your office actually bids.

  • Sub coverage tracker

    Every trade has a coverage threshold; you see at a glance which divisions need more sub bids before bid day.

  • Addendum delta

    Drop a new addendum — the takeoff diffs against the prior version and surfaces the cost impact and the affected drawings.

  • RFI ↔ spec linking

    Every RFI is anchored to the page or spec paragraph that triggered it, and the answer auto-attaches to the affected takeoff lines.

  • Branded proposal editor

    Cover letter, scope of work, exclusions, terms — all editable, with your logo and color palette.

Frequently asked

Questions we hear from estimators.

Can my project manager keep using QuickBooks?
Yes — final estimates push to QuickBooks as line items via the integration; PM workflow is unchanged.
Do you handle plan revisions during a bid window?
Drop the new set, the system runs an addendum delta and tells you what changed and which subs need re-quoting.

Next move

Bring a real general contractor bid. We'll run it.

The pilot is end-to-end: real plan set, real takeoff, real proposal. No demo data.

General Contractor Takeoff & Bid Pipeline — OmniTakeoff