Equipment
Division 11 in one takeoff group.
Division 11 covers equipment that's almost always owner-furnished — kitchen, athletic, lab, library, theatre. OmniTakeoff parses the spec, flags OFCI vs CIBO, and prices only the install scope on the contractor's takeoff.
All Div 11
Sub-divisions
First-class
OFCI / CIBO split
Substantial improvement after active learning
Recognizer accuracy after active learning
What the takeoff produces
A equipment takeoff that survives review.
Every line item carries the source it came from — sheet, detail, and spec paragraph — so the senior estimator can audit in minutes, not hours.
- Kitchen equipment (commercial) with rough-in scope split out
- Athletic equipment (basketball, scoreboards) per spec section
- Lab casework + fume hood install scope
- Library shelving / book-stack install
- Theatre / stage equipment as a separate scope group
- OFCI install labor stays on the contractor takeoff; product cost routes to owner
Equipment features
Built for the way your office actually bids.
OFCI / CIBO split
Owner-furnished / contractor-installed scope is a first-class split, not a comments column.
Rough-in coordination
MEP rough-in for owner-furnished equipment routes to the right trade takeoff.
Frequently asked
Questions we hear from estimators.
- Do you handle medical equipment install?
- Most medical equipment is owner-furnished; install scope (anchorage, MEP rough-in) lives on the GC + MEP takeoffs.
Next move
Bring a real equipment bid. We'll run it.
The pilot is end-to-end: real plan set, real takeoff, real proposal. No demo data.