Skip to main content

Equipment

Division 11 in one takeoff group.

Division 11 covers equipment that's almost always owner-furnished — kitchen, athletic, lab, library, theatre. OmniTakeoff parses the spec, flags OFCI vs CIBO, and prices only the install scope on the contractor's takeoff.

  • All Div 11

    Sub-divisions

  • First-class

    OFCI / CIBO split

  • Substantial improvement after active learning

    Recognizer accuracy after active learning

What the takeoff produces

A equipment takeoff that survives review.

Every line item carries the source it came from — sheet, detail, and spec paragraph — so the senior estimator can audit in minutes, not hours.

  • Kitchen equipment (commercial) with rough-in scope split out
  • Athletic equipment (basketball, scoreboards) per spec section
  • Lab casework + fume hood install scope
  • Library shelving / book-stack install
  • Theatre / stage equipment as a separate scope group
  • OFCI install labor stays on the contractor takeoff; product cost routes to owner

Equipment features

Built for the way your office actually bids.

  • OFCI / CIBO split

    Owner-furnished / contractor-installed scope is a first-class split, not a comments column.

  • Rough-in coordination

    MEP rough-in for owner-furnished equipment routes to the right trade takeoff.

Frequently asked

Questions we hear from estimators.

Do you handle medical equipment install?
Most medical equipment is owner-furnished; install scope (anchorage, MEP rough-in) lives on the GC + MEP takeoffs.

Next move

Bring a real equipment bid. We'll run it.

The pilot is end-to-end: real plan set, real takeoff, real proposal. No demo data.

Equipment Takeoff & Bid Pipeline — OmniTakeoff