A union-shop electrical contractor with the estimating team standardized on OmniTakeoff after a four-week pilot on a healthcare project. Their existing Bluebeam workflow was already fast — what moved the number was eliminating the count-twice-to-double-check step thanks to the evidence-linked review queue.

Industry

Commercial

Region

Midwest US

Annual revenue

Mid-market

Headline numbers

Takeoff time
Meaningful reduction

Substantial reduction in takeoff time

Bid-day defects
Meaningful reduction

Tracked across post-pilot bids

Estimator throughput
Meaningful improvement

Bids/quarter, same headcount

Challenge

What they were solving for

The team was running Bluebeam + Excel. AI tools they'd previewed dropped numbers without a paper trail — un-trustable on a multi-million-dollar healthcare bid. They needed an evidence-first workflow.

Solution

How OmniTakeoff worked

Pilot ran the AI Takeoff + Evidence Center side-by-side with their existing Bluebeam process for two bids. Symbol Library got seeded from their first three healthcare projects' legends. Review Queue caught low-confidence rows the manual count had missed.

Outcome

What changed

Standardized after four weeks. Now using OmniTakeoff for every bid >40 pages. Bluebeam stayed for one-off as-built markups.

Every line links back to the exact crop on the exact sheet. When the PM challenges a count we click and we're there. That alone saved more time than the AI did.
Senior estimator (anonymized), Midwest electrical contractor (anonymized)

Your numbers next

Apply to pilot.

Four-week pilots on real bids. We commit to specific outcome targets up front.

Cut takeoff time meaningfully on typical commercial electrical bids without growing the team. — OmniTakeoff Customer Case Study